Production Process

Pool Production Process

Pool production step 1a
Pool production step 1b

Step: 1 Mould ready for production

Every pool that is built has a 5 digit number so a pool can be tracked once it has left the site and for the Q.C process. The label is waxed and once the pool has been released off the mould the label will be flicked out to leave behind an indent of the digits.

Pool production step 2a
Pool production step 2b

Step: 2 Gelcoating

8.5m Monaco that has been gel-coated in Royal Blue. This is applied on at 0.8mm to 1.0mm. 7.2m Monaco that has been gel-coated in Sandstone – again this is applied on at 0.8mm to 1.0mm.

Pool production step 3a
Pool production step 3b

Step: 3 Tie-laying with vinyl ester

VE is applied on at 1.5mm to 2.0 mm thick.

Pool production step 4a
Pool production step 4b

Step: 4 Skin, re-inforcement & Lifting Hook Application

Once the Skin has been applied all the Divinycell/Klegecell stiffeners are placed on the skin this is done as the resin is curing to give maximum bond.The lifting hooks are glassed in on this stage so they can be used at a later date to release the pool off the mould.These will be glassed over again for maximum strength.

Pool production step 5a
Pool production step 5b

Step: 5 Re-inforcement & Additional Skin

The reinforcement is now applied. This will go over all the Divinycell/Klegecell and stiffeners and the hooks also are re-glassed for more strength.
This is then rolled to eliminate all of the air trapped in the glass.

Pool production step 6a
Pool production step 6b

Step: 6 Curing & Release from Mould

Pool built and once cured this will be released off the mould to be trimmed and detailed.
Brick ties have also been placed in the coping when the pool is built. This is so the pool can be tied into the concrete bond beam when it is installed in the ground.
8.5m Monaco pool being released off the mould. This is being lifted off with the hooks that have been glassed in as the pool was built.

Pool production step 7a
Pool production step 7b

Step: 7 Trimming, Final Inspection & Detailing

7.2m Monaco supported on drums to be trimmed and detailed and undergo final QC inspection. The skimmer box is cut and the main drain hole drilled before the pool leaves site. We keep the skimmer box cut-out as a sample which is filed,together with the pool number, shape, size and all detailed production records for future reference if required.

Pool production step 8a
Pool production step 8b

Step: 8 Finished Pool Ready for Delivery

7.2m Monaco is now ready to be loaded onto the truck for delivery.
The truck driver will check all his paperwork​ to ensure​ all pool details are correct before the pool leaves the site.

4 Quick and Easy Steps To Install Your Own Swimming Pool

Owning your dream swimming pool has never been faster, easier or more affordable with Barrier Reef Pools.

1. Request Your Free Quote

Our Friendly Barrier Reef Pools Dealer will contact you to organize an onsite quotation.

2. Approve Your Quote

Our experienced dealer will then organize all council approvals prior to commencement of your job.

3. We'll Install Your Pool

The pool excavation and construction process will begin & can be completed in as little as seven hassle free days.